FANDOM


The Sims Division is an American game development studio by Electronic Arts. It has been in production of The Sims franchise since 2006 in which Electronic Arts acquired Maxis Studios.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.