The Sims 3: Late Night is the third expansion pack for The Sims 3. It is reminince of The Sims: Hot Dice, The Sims: Superstar, and The Sims 2: Night Life. Vampires make their appearence in Late Night.
The Sims 3 neighborhoods |
---|
Sunset Valley (Base) Riverview (Free Download; Base) Barnacle Bay (Paid Download[1]; Base) Twinbrook (Ambitions) Bridgeport Late Night) |
References[]
- ↑ 2011-03-01. Electronic Arts. Now available in store.