FANDOM


The Sims 3: Late Night is the third expansion pack for The Sims 3. It is reminince of The Sims: Hot Dice, The Sims: Superstar, and The Sims 2: Night Life. Vampires make their appearence in Late Night.


The Sims 3 neighborhoods
Sunset Valley (Base) Riverview (Free Download; Base) Barnacle Bay (Paid Download[1]; Base)
Twinbrook (Ambitions)
Bridgeport Late Night)

References

  1. 2011-03-01. Electronic Arts. Now available in store.