FANDOM


The Sims 3: Ambitions is the second expansion pack for The Sims 3. In The Sims 3: Ambitions, you will have more control over your sims work, new neighborhood, and new lot features. The neighborhood of this expansion pack is called Twinbrook and it is, then at the time of release, the largest neighborhood. When The Sims 3: Late Night came out, Bridgeport became the largest neighborhood.


The Sims 3 neighborhoods
Sunset Valley (Base) Riverview (Free Download; Base) Barnacle Bay (Paid Download[1]; Base)
Twinbrook (Ambitions)
Bridgeport Late Night)

ReferencesEdit

  1. 2011-03-01. Electronic Arts. Now available in store.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.