FANDOM


Celebrity star Featured Article:
This article was a Featured Article in September 2010. Its layout and content is an example of excellence on The Sims Daily Planet Wiki.

Main Series and Sequels (Major Game Release)Edit

  1. The Sims (2000 to 2004)
  2. The Sims 2 (2004 to 2008)
  3. The Sims 3 (2009 to 2013)
  4. The Sims 4 (2014 to Current)

Spin-offs Edit

  1. The Sims 2 (2004 to 2008; successor, and set 25 years after the game settings in, to The Sims, and, proceeding, and set 50 years after game story setting, to The Sims 3)
  2. The Sims 3 (2009 to Current; successor, and set 50 years before the game settings, to The Sims 2 but, according to game developers that the game is a prequel to The Sims; which is set 25 years before the actual game story in The Sims game.)
  3. The Sims OnLine (2002 to 2008; Online version of The Sims game.)
  4. MySims (2004 to Current)
  5. SimAnimals (2008[citation needed] to Current)

Other Uses Edit

  1. The Sims (series) - Overall view of the timeline of the The Sims (series) games.
  2. List of Sims games - Full listings of The Sims games.
  3. SimCity - Original sims title.
  4. Sims Wiki - Affiliate to Sims Daily Planet; founded in February 2005 and has, almost, 7,000 articles created since then.
  5. Main Page (also listed overview at Sims Daily Planet) - Created in 2008 but founded as a wiki in 2009.
  6. Sims Wiki (Disambiguation) - a listing of the term Sims Wiki.
  7. Sim Brother - a game played on, either, The Sims 2 or The Sims 3 games and based off of the real life show titled Big Brother which is derived from the book Nineteen Eighty-Four.
  8. Sims Broadcasting System - a spoof sims television network. Created by Miller Technology Omnimedia Incorporated, LLC in 2000 as a fictional, then- cable television network, now an Internet Video Streaming television network. The actual location does exist on a real life town in Florida called Lynn Haven.

GalleryEdit

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.