FANDOM


This article or section is about a title, or contains information about a feature or character from a title, that is either under development or construction and yet to be released to the general public. It may contain spoilers and features that are mentioned here may be radically different in the finished product, or excluded altogether.
This article or section is about a title, or contains information about a feature or character from a title, that is either under development or yet to be released. It may contain spoilers and features that are mentioned here may be radically different in the finished product, or excluded altogether.
Main article: The Real Housewives of...
For the spin-offs of The Real Housewives of..., see The Real Housewives of...#Installments.
The Real Housewives of Twinbrook

Format

Reality

Current Housewives

To be determined

# of Seasons

1

# of Episodes

10 (at the conclusion of season 1)

Original Channel

Sims Broadcasting System

Original Run

To be determined

Status

Pre-production

Proceeded By

The Real Housewives of Barnacle Bay

Succeeded By

The Real Housewives of Bridgeport

The Real Housewives of Twinbrook [1] is a reality series television program on the Sims Broadcasting System which originally followed the lives of five women in and around several upscale communities in SimNation neighborhood Twinbrook[2] It is the network's fourth installation of The Real Housewives of... [3][4] series, following The Real Housewives of Sunset Valley [5], The Real Housewives of Riverview [6], and The Real Housewives of Barnacle Bay [7].

TheSims3

Official member of The Sims 3 Community

Production History

The Real Housewives of Twinbrook was confirmed in Spring 2011 [8] and scheduled for Spring 2013 release date [9] and on May 28 of the same year, the SBS has stated in press release that housewives will move more quicker than usual [10]

Current and Former Housewives

Housewife History

Season 1
Sim A
Sim B
Sim C
Sim D
Sim E

Current Housewives

StateofCalifornia

State of California flag.

Series History

Series overview

Season Episodes Season Premiere Season Finale
1 11 TBA TBA

Episode guide

The Real Housewives of logo
Season Episodes Season Premiere Season Finale
1 11 2012 2012
2 TBD TBD TBD
Specials
Season Episode Episode Name Description Air Date
1 1 Meet the Housewives of Twinbrook This is where we meet The Real housewives of Twinbrook TBA
2 1 Meet the new Housewife of Twinbrook This is where we meet The Real housewives of Twinbrook TBA
Season 1
Episode Episode Name Description Air Date
2 Welcome, Housewives, to Twinbrook This is series premiere of The Real Housewives of Twinbrook. TBA
3 TBA
4 TBA
5 TBA
6 TBA
7 TBA
8 TBA
9 TBA
10 TBA
11 TBA

DVD release

It is tentative at this point of time, but, the previous seasons of the series will be on sale at the local sim stores in SimNation on DVDs.

Season Episodes Release Date
1 10 TBA

Gallery

See Also

  1. 2011 - 2012 network television schedule
  2. 2012 - 2013 network television schedule
  3. 2013 - 2014 network television schedule
  4. Sims Broadcasting System
  5. The Real Housewives of...
  6. The Real Housewives of Sunset Valley
  7. The Real Housewives of Riverview
  8. The Real Housewives of Barnacle Bay
  9. The Real Housewives of Bridgeport

References

  1. 2011-01-07. Sims Broadcasting System. The SBS announced today that The Real Housewives of... is coming to Twinbrook after the success of fellow real housewives series (Sunset Valley, Riverview, and Barnacle Bay).
  2. 2011-01-07. Sims Broadcasting System. The Real Housewives of Twinbrook is the next housewives series coming to Sims Broadcasting System.
  3. 2010-10-15, Sims Broadcasting System. The SBS announced today that The Real Housewives of... is coming to their lineup after the success of Sim Brother and the Celebrity Sim Brother shows on their lineups during the 2010-11 Summer scheduled airing.
  4. 2010-10-15. Sims Broadcasting System. The Real Housewives of... on the Sims Broadcasting Systems' 2011-12 Fall season scheduled airing.
  5. 2010-10-15. Sims Broadcasting System. The Real Housewives of... on the Sims Broadcasting Systems' 2011-12 Fall season scheduled airing.
  6. 2010-10-15. Sims Broadcasting System. The Real Housewives of Riverview on the Sims Broadcasting Systems' 2012-13 Fall season scheduled airing.
  7. 2011-01--7. Sims Broadcasting System. The Real Housewives of Barnacle Bay on the Sims Broadcasting Systems' 2011-12 Spring season scheduled airing.
  8. 2011-04-03. Sims Broadcasting System. The Real Housewives goes to other areas.
  9. 2011-04-03. SBS. The air date is Spring 2013. If everything goes according to plans, it will be earlier than that.
  10. 2012-05-28. SBS. The air date moved to Fall 2012.
vde
Current Sims Broadcasting System program
Desperate HousewivesSim Brother (Celebrity)The Real Housewives of... (Sunset ValleyRiverviewBarnacle Bay)
vde
The Real Housewives of... series
Sunset ValleyRiverviewBarnacle Bay
vde
Current The Real Housewives of Twinbrook Housewives
Sim A • Sim B • Sim C • Sim D • Sim E