FANDOM


This article or section is about a title, or contains information about a feature or character from a title, that is either under development or construction and yet to be released to the general public. It may contain spoilers and features that are mentioned here may be radically different in the finished product, or excluded altogether.
This article or section is about a title, or contains information about a feature or character from a title, that is either under development or yet to be released. It may contain spoilers and features that are mentioned here may be radically different in the finished product, or excluded altogether.
Main article: The Real Housewives of...
For the spin-offs of The Real Housewives of..., see The Real Housewives of...#Installments.
The Real Housewives of Bridgeport

Format

Reality

Current Housewives

To be determined

# of Seasons

1

# of Episodes

12 (at the conclusion of season 1)

Original Channel

Sims Broadcasting System

Original Run

To be determined

Status

Pre-production

Proceeded By

The Real Housewives of Twinbrook

The Real Housewives of Bridgeport is a reality series television program that will be debuting in the future on the internet video streaming television network Sims Broadcasting System. It is the network's fifth installation of The Real Housewives of... series, following The Real Housewives of Sunset Valley, Riverview, Barnacle Bay, and Twinbrook.[1][2][3]

TheSims3

Official member of The Sims 3 Community

Premise

The Real Housewives of Bridgeport introduces five women whose relationships with each other, and with the city in which they live, are the venues for exploring the nexus of celebrity status, society, and even race, as well as how the proximity to celebrity power dictates where one fits within high society.

The women are: Sim A, Sim B, Sim C, Sim D, Sim E.

Cast members

Housewife History

Season 1
Sim A
Sim B
Sim C
Sim D
Sim E

Sim A

Sim B

Sim C

Sim D

Sim E

StateofCalifornia

State of California flag.

Series overview

Season Episodes Season Premiere Season Finale
1 11 TBA TBA

Episode guide

Specials

Season 1

Ep # Title Airdate
Special Meet the Wives TBA
1 Welcome, Housewives, to Bridgeport TBA
2 TBA
3 TBA
4 TBA
5 TBA
6 TBA
7 TBA
8 TBA
9 TBA
10 The Real Housewives Confessionals: The Reunion Show (Part 1) TBA
11 The Real Housewives Confessionals: The Reunion Show (Part 2) TBA

Ratings

DVD release

It is tentative at this point of time, but, the previous seasons of the series will be on sale at the local sim stores in SimNation on DVDs.

Season Episodes Release Date
1 11 TBA

Gallery

External links

References

  1. Sims Broadcasting System, 2010-11-30, The Real Housewives of... is rumored to be glamorized by Bridgeports' celebrities.
  2. Sims Broadcasting System, 2010-12-17, The high-in-profiled celebrities are now being considered to be the next housewives show.
  3. Sims Broadcasting System, 2011-01-11, The rumors are now being more likely to be real with the high-life found in Bridgeport.
vde
Current Sims Broadcasting System program
Desperate HousewivesSim Brother (Celebrity)The Real Housewives of... (Sunset ValleyRiverviewBarnacle Bay)
vde
The Real Housewives of... series
Sunset ValleyRiverviewBarnacle Bay
vde
Current The Real Housewives of Bridgeport Housewives
Sim A • Sim B • Sim C • Sim D • Sim E