FANDOM


Sunset Valley is the initial neighborhood that came with The Sims 3. Riverview is an optional, downloadable, neighborhood available on The Sims 3's website.

Overview

History

Sunset Valley is based off of a California town.
StateofCalifornia

State of California flag.

Families

Returning Families

New Families

Families Added or Removed From Expansion Packs

Community Lots

Gallery



Also See

The Sims 3 neighborhoods
Sunset Valley (Base) Riverview (Free Download; Base) Barnacle Bay (Paid Download[1]; Base)
Twinbrook (Ambitions)
Bridgeport Late Night)

References

  1. 2011-03-01. Electronic Arts. Now available in store.