FANDOM


These templates are to issue instruction or warning messages about our policies to new users on their talk pages.

Using this categoryEdit

To put a template in Category:Message templates:

  • Use <includeonly>[[Category:Message templates|{{PAGENAME}}]]</includeonly> on the documentation page (see Template:Documentation for more info). The "<includeonly>" tags are necessary to prevent categorizing all pages using the template (and the documentation page) in the template category! Please also note the |{{PAGENAME}}.
  • If your template is meant to be used in-line, try and make sure that there are as few line feeds (breaks, whitespace, etc.) as possible.
  • Remember that a template can be put in multiple categories if it belongs to them all!
  • Or, if this is not quite the right category, go back to Category:Templates and try to find a better suited subcategory.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.