FANDOM


Main article: Neighborhood

Barnacle Bay is a downloadable neighborhood from The Sims 3 website later to retail store item. Released in 2010 but became a store bought via download code via web access

GalleryEdit


The Sims 3 neighborhoods
Sunset Valley (Base) Riverview (Free Download; Base) Barnacle Bay (Paid Download[1]; Base)
Twinbrook (Ambitions)
Bridgeport Late Night)

ReferencesEdit

  1. 2011-03-01. Electronic Arts. Now available in store.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.